Cyclic response of hammer-head strap cladding-to-structure connections used in RC precast building
Authors:
- B. ZoubekBZB. Zoubek
- M. FischingerMFM. Fischinger
- T. IsakovićTIT. Isaković
- 1 July 2016
- journal article
- Published by Elsevier in Engineering Structures
- Vol. 119, 135-148
Abstract
No abstract availableKeywords
Funding Information
- SAFECLADDING (314122)
This publication has 12 references indexed in Scilit:
- Horizontal cladding panels: in-plane seismic performance in precast concrete buildingsBulletin of Earthquake Engineering, 2016
- Passive control of precast building response using cladding panels as dissipative shear wallsBulletin of Earthquake Engineering, 2015
- Vulnerability assessment and retrofit solutions of precast industrial structuresEarthquakes and Structures, 2015
- Nonlinear finite element modelling of centric dowel connections in precast buildingsComputers & concrete, 2014
- The Emilia Earthquake: Seismic Performance of Precast Reinforced Concrete BuildingsEarthquake Spectra, 2014
- Failure of industrial structures induced by the Emilia (Italy) 2012 earthquakesEngineering Failure Analysis, 2013
- Cyclic failure analysis of the beam-to-column dowel connections in precast industrial buildingsEngineering Structures, 2013
- Performance of industrial buildings during the Emilia earthquakes in Northern Italy and recommendations for their strengtheningBulletin of Earthquake Engineering, 2013
- Role of wall panel connections on the seismic performance of precast structuresBulletin of Earthquake Engineering, 2013
- Precast concrete structures: the lessons learned from the L'Aquila earthquakeStructural Concrete, 2012