Abstract
A study of the run length distribution of a Shewhart control chart is important before the chart is implemented in process monitoring. Interpretations based on the average run length (ARL) alone can be misleading since the in-control run length distribution of a Shewhart chart is highly skewed. This article highlights the importance of computing the percentage points of the run length distribution, which enables practitioners to determine the qth- (0 < q < 100) percentage points of the time to signal (PPTS (q)) and the qth- percentage points of the number of individual units sampled, say, I (q), to detect a shift for a Shewhart chart. Examples will be given to illustrate the benefits and usefulness of computing the two performance measures, PPTS (q) and I (q). Formulas to aid practitioners in computing the percentage points of the run length distribution and to determine the two performance measures will also be provided.

This publication has 3 references indexed in Scilit: