Minimum Moment Method for Resource Leveling Using Entropy Maximization
- 1 May 2010
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 136 (5) , 518-527
Abstract
The minimum moment method for resource leveling is revisited and restated as an entropy-maximization problem. The minimum moment method assumes that the moment of the daily resource demands about the horizontal axis of a project’s resource histogram is a good measure of the resource utilization and that the optimal resource allocation exists when the total moment is at a minimum, thus when the resource histogram is of rectangular shape. The entropy-maximization method proposed in this paper makes use of the general theory of entropy and two of its principal properties (subadditivity and maximality) to revisit the minimum moment method for resource leveling. The entropy-maximization method presented allows for activity stretching and provides resource allocation solutions that show improvement over previous approaches. A case study is also presented that validates the results.Keywords
This publication has 20 references indexed in Scilit:
- Resource-Constrained Scheduling using Ant Colony Optimization2009
- Disorder considerations in resource‐constrained schedulingConstruction Management and Economics, 2009
- A bid‐unbalancing method for lowering a contractor's financial riskConstruction Management and Economics, 2008
- Ant Colony Optimization in Construction Scheduling2005
- Long-Term Entropy and Profitability Change of United States Public Construction FirmsJournal of Management in Engineering, 2005
- Lower bounds for resource-constrained project scheduling problemsEuropean Journal of Operational Research, 2003
- A branch and bound algorithm for the resource-constrained project scheduling problemEuropean Journal of Operational Research, 1998
- New Benchmark Results for the Resource-Constrained Project Scheduling ProblemManagement Science, 1997
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling ProblemManagement Science, 1992
- Advances in Critical Path MethodsJournal of the Operational Research Society, 1966