The working medium for the megawatt class utilization heat and power complex based on Organic Rankine Cycle

Authors:

Abstract
The paper proposes a criterion for choosing low-boiling working medium type and the main parameters of the heat recovery unit using the heat of the gas-turbine drive exhaust gases with a capacity of 1 MW for the gas compressor station's own needs and the methodology for determining it at the initial design stage. The data of thermal design and capital costs calculations for the creation of an installation for five types of working mediums are given, as well as the choice of n-pentane as best-satisfying all the requirements.