Assessment of BTEX‐induced health risk under multiple uncertainties at a petroleum‐contaminated site: An integrated fuzzy stochastic approach
- 24 December 2011
- journal article
- Published by American Geophysical Union (AGU) in Water Resources Research
- Vol. 47 (12)
Abstract
Groundwater pollution has gathered more and more attention in the past decades. Conducting an assessment of groundwater contamination risk is desired to provide sound bases for supporting risk‐based management decisions. Therefore, the objective of this study is to develop an integrated fuzzy stochastic approach to evaluate risks of BTEX‐contaminated groundwater under multiple uncertainties. It consists of an integrated interval fuzzy subsurface modeling system (IIFMS) and an integrated fuzzy second‐order stochastic risk assessment (IFSOSRA) model. The IIFMS is developed based on factorial design, interval analysis, and fuzzy sets approach to predict contaminant concentrations under hybrid uncertainties. Two input parameters (longitudinal dispersivity and porosity) are considered to be uncertain with known fuzzy membership functions, and intrinsic permeability is considered to be an interval number with unknown distribution information. A factorial design is conducted to evaluate interactive effects of the three uncertain factors on the modeling outputs through the developed IIFMS. The IFSOSRA model can systematically quantify variability and uncertainty, as well as their hybrids, presented as fuzzy, stochastic and second‐order stochastic parameters in health risk assessment. The developed approach haw been applied to the management of a real‐world petroleum‐contaminated site within a western Canada context. The results indicate that multiple uncertainties, under a combination of information with various data‐quality levels, can be effectively addressed to provide supports in identifying proper remedial efforts. A unique contribution of this research is the development of an integrated fuzzy stochastic approach for handling various forms of uncertainties associated with simulation and risk assessment efforts.Keywords
This publication has 54 references indexed in Scilit:
- Simulation-based risk assessment of contaminated sites under remediation scenarios, planning periods, and land-use patterns—a Canadian case studyStochastic Environmental Research and Risk Assessment, 2005
- 2D Monte Carlo versus 2D Fuzzy Monte Carlo health risk assessmentStochastic Environmental Research and Risk Assessment, 2005
- Probabilistic-fuzzy health risk modelingStochastic Environmental Research and Risk Assessment, 2004
- Stochastic multimedia risk assessment for a site with contaminated groundwaterStochastic Environmental Research and Risk Assessment, 2002
- A methodology to integrate site characterization information into groundwater‐driven health risk assessmentWater Resources Research, 1999
- On uncertainty in remediation analysis: variance propagation from subsurface transport to exposure modelingReliability Engineering & System Safety, 1998
- On the development of a new methodology for groundwater‐Driven health risk assessmentWater Resources Research, 1998
- The use of two‐stage Monte Carlo simulation techniques to characterize variability and uncertainty in risk analysisHuman and Ecological Risk Assessment: An International Journal, 1996
- An introduction to second‐order random variables in human health risk assessmentsHuman and Ecological Risk Assessment: An International Journal, 1996
- Evaluation of Risk from Contaminants Migrating by GroundwaterWater Resources Research, 1996