A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach
Authors:
- Yi-Min FuYFYi-Min Fu
- Ali DiabatADAli Diabat
- I-Tsung TsaiITI-Tsung Tsai
- 1 November 2014
- journal article
- Published by Elsevier in Expert Systems with Applications
- Vol. 41 (15) , 6959-6965
Abstract
No abstract availableThis publication has 13 references indexed in Scilit:
- An efficient genetic algorithm for solving the quay crane scheduling problemExpert Systems with Applications, 2012
- A modified genetic algorithm for quay crane scheduling operationsExpert Systems with Applications, 2012
- The crane scheduling problem: models and solution approachesAnnals of Operations Research, 2010
- An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container portsComputers & Industrial Engineering, 2009
- Heuristics for the integration of crane productivity in the berth allocation problemTransportation Research Part E: Logistics and Transportation Review, 2009
- The simultaneous berth and quay crane allocation problemTransportation Research Part E: Logistics and Transportation Review, 2008
- Berthing ships at a multi-user container terminal with a limited quay capacityTransportation Research Part E: Logistics and Transportation Review, 2008
- A crane scheduling method for port container terminalsEuropean Journal of Operational Research, 2004
- The dynamic berth allocation problem for a container portTransportation Research Part B: Methodological, 2001
- The crane scheduling problemTransportation Research Part B: Methodological, 1989