A chronological transmission expansion planning method and its comparison with stochastic planning
Open Access
- 1 August 2025
- journal article
- Published by AIP Publishing in AIP Advances
- Vol. 15 (8)
Abstract
We propose a chronological transmission expansion planning (Chr-TEP) model that includes the temporal constraints of thermal power units and considers the time series of wind power, solar power, and load demands. The basic idea of this model is to obtain the optimal planning scheme by simulating the actual operation of the future power system. We adopt a cyclic modeling approach to solve the computational feasibility problem and address the issue of redundancy in the planning scheme through the maximum net load shifting technique. We compare the proposed model with a two-stage stochastic transmission expansion planning (Sto-TEP) model by observing changes in planning schemes, costs, and computational time with different time spans of scenarios or cycles and various clustering methods. Case studies are conducted on Garver’s 6-bus, IEEE 24-bus, and IEEE 118-bus systems. The results show that due to the simulation of future system operation and the consideration of constraints that better align with actual operating conditions, the Chr-TEP model generally plans more lines than the Sto-TEP model to ensure the feasibility of future operation. In addition, when considering temporal constraints in the Sto-TEP model, its computational time increases significantly, while the Chr-TEP model has an advantage in terms of computational efficiency.Keywords
Funding Information
- State Grid Jilin Electric Power Co., Ltd. (SGJLJY00ZLJS2400021)
This publication has 31 references indexed in Scilit:
- A comprehensive stochastic-based adaptive robust model for transmission expansion planningElectric Power Systems Research, 2024
- An efficient four-level programming model for optimizing tri-stage adaptive robust transmission expansion planningElectric Power Systems Research, 2023
- Chance-constrained coordinated generation and transmission expansion planning considering demand response and high penetration of renewable energyInternational Journal of Electrical Power & Energy Systems, 2023
- A Flexibility-oriented robust transmission expansion planning approach under high renewable energy resource penetrationApplied Energy, 2023
- Multi-chronological hierarchical clustering to solve capacity expansion problems with renewable sourcesEnergy, 2021
- Scenario-based probabilistic multi-stage optimization for transmission expansion planning incorporating wind generation integrationElectric Power Systems Research, 2020
- New bounding and decomposition approaches for MILP investment problems: Multi-area transmission and generation planning under policy constraintsEuropean Journal of Operational Research, 2016
- Wind energy evaluation for electricity generation using WECS in seven selected locations in NigeriaApplied Energy, 2011
- Transmission expansion planning: a mixed-integer LP approachIEEE Transactions on Power Systems, 2003
- Incorporation of wind energy conversion systems in conventional generating capacity adequacy assessmentIEE Proceedings C Generation, Transmission and Distribution, 1992