Development of integrated and interactive spatial planning system of assembly blocks in shipbuilding
Authors:
- 27 November 2008
- journal article
- research article
- Published by Taylor & Francis in International Journal of Computer Integrated Manufacturing
- Vol. 21 (8) , 911-922
Abstract
As the shipbuilding industry expands, accurate and efficient planning and scheduling of the production process is becoming increasingly important and complex. The availability of space and load in workshops should thus be examined in scheduling the production process. The variety of material, facilities, and information resources makes the spatial planning difficult. In the present work, a spatial planning and scheduling system is developed to support spatial planning and scheduling in block assembly shops, and the workload balance of workshops. The requirements and functions of the system are described and functional components are designed and implemented, based on an object-oriented methodology. The integrated environment is presented in this paper. This system can be expanded to any workshop that requires spatial planning and scheduling.Keywords
This publication has 7 references indexed in Scilit:
- An integrated system for managing ship repair operationsInternational Journal of Computer Integrated Manufacturing, 2005
- A New Placement Heuristic for the Orthogonal Stock-Cutting ProblemOperations Research, 2004
- A spatial scheduling application at the block paint shop in shipbuilding: the HYPOS projectProduction Planning & Control, 2002
- A decision-making approach for nesting scheduling: A textile caseInternational Journal of Production Research, 2000
- Shop-floor scheduling at shipbuilding yards using the multiple intelligent agent systemJournal of Intelligent Manufacturing, 1997
- Marker-making using automatic placement of irregular shapes for the garment industryComputers & Graphics, 1990
- Nesting two-dimensional shapes in rectangular modulesComputer-Aided Design, 1976