Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
Authors:
- K. NeumannKNK. Neumann
- J. ZimmermannJZJ. Zimmermann
- 1 December 2000
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 127 (2) , 425-443
Abstract
No abstract availableKeywords
This publication has 21 references indexed in Scilit:
- Algorithms for Scheduling Projects with Generalized Precedence Relations1999
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relationsComputers & Operations Research, 1998
- Project network models with discounted cash flows a guided tour through recent developmentsEuropean Journal of Operational Research, 1997
- Heuristic procedures for resource—constrained project scheduling with minimal and maximal time lags: the resource—levelling and minimum project—duration problemsJournal of Decision Systems, 1996
- Minimizing Resource Availability Costs in Time-Limited Project NetworksManagement Science, 1995
- Optimal resource leveling using non-serial dyanamic programmingEuropean Journal of Operational Research, 1994
- Packing Method for Resource Leveling (Pack)Journal of Construction Engineering and Management, 1990
- Resource Leveling in Construction by OptimizationJournal of Construction Engineering and Management, 1989
- Scheduling project networks with resource constraints and time windowsAnnals of Operations Research, 1988
- The payment scheduling problemNaval Research Logistics Quarterly, 1972