Abstract
The author in this article conducts discussion on the square steel structure construction management of owner from the engineering management scheme to management in construction preparation stage, management of material procurement and inspection, steel structure assembling and connection, steel structure hoisting and other steps by combining with practical experience in the wide span aerial corridor steel structure work of "the 11th five year plan" technological transformation project on relocation of China Tobacco Hangzhou Cigaret Factory, which can be used for reference by craft brothers