A feasibility study of applying storage-based wind farm as black-start power source in local power grid
Authors:
- 1 October 2016
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 257-261
Abstract
In view of the condition and demand of HulunBuir power grid, it could play an important role in enhancing its restoration speed to find or build new power source applied for black-start. Firstly, a black-start scheme is proposed for it, in which the East Hailar Thermal Power Plant in Hailar district can be started through using the Daliang wind farm configured with high-capacity battery energy storage system. Secondly, the feasibility of the proposed black-start scheme is verified through analyzing the simulation results. Finally, some key technical problems needed to be further solved are proposed based on the study.Keywords
This publication has 5 references indexed in Scilit:
- A comparative overview of large-scale battery systems for electricity storageRenewable and Sustainable Energy Reviews, 2013
- Stand-Alone Doubly-Fed Induction Generators (DFIGs) With Autonomous Frequency ControlIEEE Transactions on Power Delivery, 2013
- Energization of Wind Turbine Transformers With an Auxiliary Generator in a Large Offshore Wind Farm During Islanded OperationIEEE Transactions on Power Delivery, 2011
- Using Low Voltage MicroGrids for Service RestorationIEEE Transactions on Power Systems, 2007
- Simulation and field tests of the black start of a large coal-fired generating station utilizing small remote hydro generationIEEE Transactions on Power Systems, 1990