Laboratory insights into land subsidence caused by water-sand mixing inrush in viscous sand layers
Open Access
- 19 May 2025
- journal article
- research article
- Published by Springer Nature in Scientific Reports
- Vol. 15 (1) , 1-12
Abstract
Water-sand inrush has emerged as a significant geological hazard during underground construction in water-rich sand layers, posing severe risks to engineering safety. This study investigates the land subsidence caused by water-sand inrush using a custom-built, three-dimensional (3D) transparent model testing system. Experiments were conducted under four water pressures (0, 0.05, 0.1, and 0.15 MPa) and three clay contents (1%, 5%, and 10%). The findings indicate that both the rate and shape of land subsidence caused by water-sand inrush are significantly influenced by the clay content and water pressure. Primarily, the initial rate of water-sand inrush was determined by water pressure, whereas its effect on the final subsidence configuration is minimal. In contrast, clay significantly affects both the rate of sand inrush reduction and the final subsidence morphology. Increasing clay content from 1 to 10% reduced the maximum subsidence depth from 57.5 cm to 42 cm and extended the stabilization time from approximately 20–70 min. At clay concentrations below 5%, the subsidence trough has a two-stage characteristic, transitioning from a steep to a gentle slope. However, at higher clay contents (above 10%), the subsidence trough maintains a consistent gentle slope. No distinct steep section is observed. Based on these findings, a quantitative model was developed to describe the evolution of subsidence troughs resulting from water-sand intrusion. This model was validated against an actual engineering case in Yulin City, where the predicted maximum subsidence depth (4.04 m) and the subsidence radius (65.15 m) was accurately captured. The research results might provide guidance for predicting land subsidence due to water–sand mixing inrush hazard during the construction of tunnels or mines in viscous water-rich areas.Keywords
Funding Information
- Open Research Fund of State Key Laboratory of Geomechanics and Geotechnical Engineering (Z019021, Z019021)
- Shaanxi Provincial Department of Education Key Scientific Research Projects for the Year 2022 (22JS040)
- Special Fund for the Launch of Scientific Research in Xijing University (XJ18T04)
This publication has 25 references indexed in Scilit:
- Investigating the dynamics of water–sand mixing inrush in viscous sand layers: insights from laboratory experimentsNatural Hazards, 2024
- Overburden failure and water–sand mixture outburst conditions of weakly consolidated overlying strata in Dananhu No.7 coal mineScientific Reports, 2024
- Evolution mechanism of tunnel water and sand inrush considering water-rich sandy dolomite hazard-causing structuresEngineering Failure Analysis, 2023
- Model test study on the mechanical response of metro tunnel to land subsidenceTunnelling and Underground Space Technology, 2023
- Surface subsidence disasters over Xuzhou city, China 2014–2018 revealed by InSAR and Peck modelEnvironmental Earth Sciences, 2023
- Failure mechanisms of ground collapse caused by shield tunnelling in water-rich composite sandy stratum: A case studyEngineering Failure Analysis, 2023
- Prevention of water and sand inrush during mining of extremely thick coal seams under unconsolidated Cenozoic alluviumBulletin of Engineering Geology and the Environment, 2020
- Surface crack and sand inrush disaster induced by high-strength mining: example from the Shendong coal field, ChinaGeosciences Journal, 2018
- Assessment and Prevention of Water and Sand Inrush Associated with Coal Mining Under a Water-filled Buried Gully: A Case StudyMine Water and the Environment, 2017
- Overburden failure and the prevention of water and sand inrush during coal mining under thin bedrockMining Science and Technology (China), 2011