Abstract
In order to effectively address the potential hazards associated with the construction of Phase II of the YE Water Supply Project’s KS tunnel in Xinjiang, this study employs the WBS-RBS (Work Breakdown Structure and Risk Breakdown Structure) method for risk identification. This approach aims to identify various risks that may arise during TBM (Tunnel Boring Machine) construction. To prevent incomplete risk factor identification resulting from subjective judgment, a risk index system is established based on the identification results. Subsequently, a matter-element extension model is utilized to quantify the risk factors within this index system, and comprehensive weights are determined using variable weight theory to assess construction risk levels. Importance analysis of each index is then conducted to identify those with significant impact on risk evaluation outcomes. Finally, by comparing actual engineering cases with other risk evaluation models, this paper verifies the reliability of its constructed risk assessment model and proposes measures for controlling potential risks based on these evaluations. The paper provides a clear definition of safety risks encountered during TBM construction and conducts comprehensive risk assessments as a valuable reference for research related to the tunnel boring machine construction period in tunnel engineering.Keywords
This publication has 23 references indexed in Scilit:
- Effects of Creep on Shield Tunnelling Through Squeezing GroundRock Mechanics and Rock Engineering, 2023
- An estimation equation for the TBM thrust force in creeping rockComputers and Geotechnics, 2023
- Experimental methods in chemical engineering: Data processing and data usage in decision‐makingThe Canadian Journal of Chemical Engineering, 2023
- Risk assessment of TBM jamming based on Bayesian networksBulletin of Engineering Geology and the Environment, 2021
- Comprehensive weighted matter-element extension method for the safety evaluation of underground gas storageRoyal Society Open Science, 2020
- Sustainable use zoning of land resources considering ecological and geological problems in Pearl River Delta Economic Zone, ChinaScientific Reports, 2019
- A chance-constrained stochastic approach to intermodal container routing problemsPLOS ONE, 2018
- A study on task management system2016
- Towards a Fuzzy Bayesian Network Based Approach for Safety Risk Analysis of Tunnel‐Induced Pipeline DamageRisk Analysis, 2015
- Managing Project Risks Using a Cross Risk Breakdown MatrixRisk Management, 2006