Capacitated dynamic lot sizing problems in closed-loop supply chain
Authors:
- Zhendong PanZPZhendong Pan
- Jiafu TangJTJiafu Tang
- Ou LiuOLOu Liu
- 1 November 2009
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 198 (3) , 810-821
Abstract
No abstract availableKeywords
This publication has 13 references indexed in Scilit:
- Dynamic lot sizing with product returns and remanufacturingInternational Journal of Production Research, 2006
- Single item lot sizing problemsEuropean Journal of Operational Research, 2006
- Dynamic lot sizing with returning items and disposalsIIE Transactions, 2002
- Economic lot-sizing with remanufacturing optionsIIE Transactions, 2001
- The reverse Wagner/Whitin model with variable manufacturing and remanufacturing costInternational Journal of Production Economics, 2001
- Remanufacturing planning for the reverse Wagner/Whitin modelsEuropean Journal of Operational Research, 2000
- A new dynamic programming algorithm for the single item capacitated dynamic lot size modelJournal of Global Optimization, 1994
- Computational Complexity of the Capacitated Lot Size ProblemManagement Science, 1982
- Deterministic Production Planning: Algorithms and ComplexityManagement Science, 1980
- Deterministic Production Planning with Concave Costs and Capacity ConstraintsManagement Science, 1971