Applying moving windows to software effort estimation
Authors:
- 1 October 2009
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 19493770,p. 111-122
Abstract
Models for estimating software development effort are commonly built and evaluated using a set of historical projects. An important question is which projects to use as training data to build the model: should it be all of them, or a subset that seems particularly relevant? One factor to consider is project age: is it best to use the entire history of past projects, or is it more appropriate in a rapidly changing world to use a window of recent projects? We investigate the effect on estimation accuracy of using a moving window, using projects from the ISBSG data set. We find that using a moving window can improve accuracy, and we make some observations about factors that influence the range of possible window sizes and the best window size.Keywords
This publication has 9 references indexed in Scilit:
- Using prior-phase effort records for re-estimation during software projects2011
- Optimal project feature weights in analogy-based cost estimation: improvement and limitationsIEEE Transactions on Software Engineering, 2006
- An Empirical Analysis of Software Productivity over Time2005
- Software productivity and effort prediction with ordinal regressionInformation and Software Technology, 2005
- Increasing the accuracy and reliability of analogy-based cost estimation with extensive project feature dimension weighting2004
- Using Genetic Programming to Improve Software Effort Estimation Based on General Data Sets2003
- An empirical study of maintenance and development estimation accuracyJournal of Systems and Software, 2002
- What accuracy statistics really measureIEE Proceedings - Software, 2001
- Detection of Influential Observation in Linear RegressionTechnometrics, 1977