Abstract
Grid connection of intermittent renewable energy such as wind power and photovoltaic results in challenges of keeping power balance for power system operation. In order to solve this problem, this paper proposed a multi-time scale coordinated scheduling model for the combined system of Wind power-Photovoltaic-Thermal generator-Hydro pumped storage-Battery (WPTHB) by taking advantages of their complementary operation characteristics. The scheduling model is composed of three time scales: the day-ahead scheduling, the 1-hour ahead scheduling and 15-minute ahead scheduling. 1) in the day-ahead scheduling, based on the 24-hour ahead forecast data of Wind-Photovoltaic power and Load demand (WPL), the optimal power outputs of thermal power units are solved from a mix integer linear programming (MILP) model to achieve the minimal operation cost of thermal units. 2) In the 1-hour ahead scheduling, based on power output of thermal units optimized in the day-ahead scheduling and the hourly forecasted WPL, the hydro pumped unit power outputs are optimally dispatched to minimize their operation cost. 3) In the 15-minute ahead scheduling, based on day-ahead optimal power outputs of thermal units and the 1-hour ahead optimal outputs of pumped storage, the battery optimal power generation is obtained from an AC optimal power flow model solved by MATPOWER. Simulation of the New England system has validated that the proposed multi-time scale coordinated scheduling model could fully explore the distinguished power regulation speed and capacities of thermal power units, hydro pumped storages and batteries to effectively track WPL variations and achieve system economic operation simultaneously.Keywords
Funding Information
- The Smart Grid Joint Foundation Program of National Natural Science Foundation of China and State Grid Corporation of China (U1866204)
- Jiangsu Basic Research Project (BK20180284)
- Fundamental Research Funds for the Central Universities (2019MS007)
- China National Study Foundation (201906735013)
This publication has 28 references indexed in Scilit:
- An interactive cooperation model for neighboring virtual power plantsApplied Energy, 2017
- Robust unit commitment for large-scale wind generation and run-off-river hydropowerCSEE Journal of Power and Energy Systems, 2016
- Research on thermal-hydro-wind joint scheduling considering N-1 security constraints2016
- Hydropower and Power-to-gas Storage Options: The Brazilian Energy System CaseEnergy Procedia, 2016
- The benefits of flexibility: The value of wind energy with hydropowerApplied Energy, 2016
- Energy Systems Integration: An Evolving Energy ParadigmThe Electricity Journal, 2014
- Assessment of Japan's Optimal Power Generation Mix Considering Massive Deployment of Variable Renewable Power GenerationElectrical Engineering in Japan, 2013
- A Computationally Efficient Mixed-Integer Linear Formulation for the Thermal Unit Commitment ProblemIEEE Transactions on Power Systems, 2006
- Self-scheduling of a hydro producer in a pool-based electricity marketIEEE Transactions on Power Systems, 2002
- Experiences with mixed integer linear programming based approaches on short-term hydro schedulingIEEE Transactions on Power Systems, 2001