The Role of Out-of-Market Corrections in Day-Ahead Scheduling
Authors:
- 19 September 2014
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 30 (4) , 1937-1946
Abstract
In order to ensure a reliable and continuous supply of electric energy, operators must manage hundreds to thousands of generators with complex operating requirements, maintain synchronism, and manage thousands of transmission assets. Further complications arise due to stringent reliability standards, resource uncertainty, and limited economical energy storage. With advances in algorithmic performance and hardware, such optimization problems still require an engineered and simplified market structure. Market operators must therefore adjust the proposed market solution in order to obtain a valid solution. An overview of existing industry practices related to such market adjustments, referred to as out-of-market corrections, is presented. This paper also analyzes the market implications and required out-of-market corrections for the day-ahead scheduling process. Multiple out-of-market correction algorithms are created and used to analyze the potential impacts on market solutions and settlements. Finally, such solutions are compared against an extensive form stochastic unit commitment solution.Keywords
This publication has 7 references indexed in Scilit:
- Market implications of reliability unit commitment formulations for Day-Ahead scheduling2014
- Analyzing the impacts of out-of-market corrections2013
- Market design for the simultaneous optimization of the Day-Ahead market and the reliability unit commitment applications2013
- Reserve zone determination based on statistical clustering methods2012
- The role of system reliability in Southwest Power Pool Integrated Marketplace2012
- Co-Optimization of Generation Unit Commitment and Transmission Switching With N-1 ReliabilityIEEE Transactions on Power Systems, 2010
- Theoretical and practical considerations in implementing and using a reliability unit commitment (RUC) in restructured electricity markets2006