An Alternate Procedure for the Optimization of Operations for Planning with Multiple River, Multiple Purpose Systems

Authors:
  • WHWarren A. Hall
    Warren A. Hall
  • GTG. W. Tauxe
    G. W. Tauxe
  • WYW. W‐G. Yeh
    W. W‐G. Yeh

Abstract
A technique is developed for maximizing the financial feasibility of a complex, multiple river water resources system for planning purposes, based on deliveries of firm power, in‐season water, dump power, and off‐season water, with flood control and releases for noncommensurate objectives as parameters.This method is an important modification of a previously reported analysis involving dynamic programing, linear programing, and modified gradient procedure, replacing the computationally inefficient linear programing determination of the shadow prices by a standard sequence of constraints. Total computation time is reduced from hours to minutes.

This publication has 1 reference indexed in Scilit: