Scheduling of crude oil refinery operation with desalting as a separate task
- 15 July 2020
- journal article
- research article
- Published by Wiley in Asia-Pacific Journal of Chemical Engineering
- Vol. 15 (6)
Abstract
A crude oil refining is a capital intensive process and releases a huge amount of environmentally unfriendly side‐products. Scheduling of crude oil that determines the optimal unloading of crude from vessels to storages, transfer to blending tanks, and charging to distillation units (CDUs) in a way that minimizes the total operating cost has become the focus of the studies in the last few decades. In this paper, we present a model that extends the literature work of a unit‐specific event‐based model to incorporate desalting as a separate task and allows a desalting tank to feed multiple CDUs. The formulation is based on a state task network (STN) that uses a unit‐specific event‐based time representation. It considers different scenarios like simultaneous or sequential discharging of products and by‐products from a desalting tank and whether a desalting tank feeding to multiple CDUs is allowed simultaneously or not. The proposed model leads a step closure to the reality and enables to know the amount of wash water needed, and the sludge disposed off for treatment in addition to the ordinary crude oil scheduling formulation. The performance of the proposed formulation is demonstrated using four case studies.Keywords
This publication has 31 references indexed in Scilit:
- Stochastic scheduling problem with varying weight for each jobAsia-Pacific Journal of Chemical Engineering, 2010
- Efficient optimization strategies with constraint programmingAIChE Journal, 2009
- An Analysis of Some Unit-Specific Event-Based Models for the Short-Term Scheduling of Noncontinuous ProcessesIndustrial & Engineering Chemistry Research, 2009
- A Robust Event-Based Continuous Time Formulation for Tank Transfer SchedulingIndustrial & Engineering Chemistry Research, 2007
- Continuous-Time Models for Short-Term Scheduling of Multipurpose Batch Plants: A Comparative StudyIndustrial & Engineering Chemistry Research, 2006
- Novel solution approach for optimizing crude oil operationsAIChE Journal, 2004
- Refinery Short-Term Scheduling Using Continuous Time Formulation: Crude-Oil OperationsIndustrial & Engineering Chemistry Research, 2003
- Effective Continuous-Time Formulation for Short-Term Scheduling. 1. Multipurpose Batch ProcessesIndustrial & Engineering Chemistry Research, 1998
- Effective Continuous-Time Formulation for Short-Term Scheduling. 2. Continuous and Semicontinuous ProcessesIndustrial & Engineering Chemistry Research, 1998
- Mixed-Integer Linear Programming Model for Refinery Short-Term Scheduling of Crude Oil Unloading with Inventory ManagementIndustrial & Engineering Chemistry Research, 1996