Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system
Authors:
- Reza RamezanianRRReza Ramezanian
- Mohammad Saidi-MehrabadMSMohammad Saidi-Mehrabad
- 1 April 2013
- journal article
- Published by Elsevier in Applied Mathematical Modelling
- Vol. 37 (7) , 5134-5147
Abstract
No abstract availableKeywords
This publication has 24 references indexed in Scilit:
- The capacitated lot sizing problem: a review of models and algorithmsOmega, 2003
- Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industryInternational Journal of Production Economics, 2003
- MIP-based heuristics for capacitated lotsizing problemsInternational Journal of Production Economics, 2003
- Rolling-horizon lot-sizing when set-up times are sequence-dependentInternational Journal of Production Research, 2000
- A review of the stochastic lot scheduling problemInternational Journal of Production Economics, 1999
- Some insights into proportional lot sizing and schedulingJournal of the Operational Research Society, 1998
- Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-upsInternational Journal of Production Research, 1997
- Multi-level, single-machine lot sizing and scheduling (with initial inventory)European Journal of Operational Research, 1996
- Optimization by Simulated AnnealingScience, 1983
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983