Scheduling identical parallel machines with tooling constraints
Authors:
- Andreza Cristina BeezãoABAndreza Cristina Beezão
- Jean-François CordeauJCJean-François Cordeau
- Gilbert LaporteGLGilbert Laporte
- Horacio Hideki YanasseHYHoracio Hideki Yanasse
- 1 March 2017
- journal article
- research article
- Published by Elsevier in European Journal of Operational Research
- Vol. 257 (3) , 834-844
Abstract
No abstract availableKeywords
Funding Information
- Conselho Nacional de Desenvolvimento Científico e Tecnológico
- Natural Sciences and Engineering Research Council of Canada (2014–04959, 2015–06189)
- Fundação de Amparo à Pesquisa do Estado de São Paulo
- Coordenação de Aperfeiçoamento de Pessoal de Nível Superior
This publication has 60 references indexed in Scilit:
- An adaptive large neighborhood search heuristic for Two-Echelon Vehicle Routing Problems arising in city logisticsComputers & Operations Research, 2012
- An adaptive large neighborhood search heuristic for the cumulative capacitated vehicle routing problemComputers & Operations Research, 2012
- Optimization of operation and changeover time for production planning and scheduling in a flexible manufacturing systemComputers & Industrial Engineering, 2009
- Due date and cost-based FMS loading, scheduling and tool managementInternational Journal of Production Research, 2007
- A tabu search based algorithm for minimizing the number of tool switches on a flexible machineComputers & Industrial Engineering, 2003
- Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporterInternational Journal of Production Research, 1997
- An improved tabu search approach for solving the job shop scheduling problem with tooling constraintsDiscrete Applied Mathematics, 1996
- Minimizing the number of tool switches on a flexible machineInternational Journal of Flexible Manufacturing Systems, 1994
- Cutting-tool management in computer-integrated manufacturingInternational Journal of Flexible Manufacturing Systems, 1992
- Total tool requirements in multi-level machining systemsInternational Journal of Production Research, 1991