Key influences to cost modelling and analysis in off-site construction: research trends and GAP analysis
Authors:
Open Access
- 14 November 2023
- journal article
- research article
- Published by Taylor & Francis in Architectural Engineering and Design Management
- Vol. 20 (6) , 1335-1356
Abstract
No abstract availableKeywords
This publication has 83 references indexed in Scilit:
- Target value design: using collaboration and a lean approach to reduce construction costConstruction Management and Economics, 2012
- Demystifying the cost barriers to offsite construction in the UKConstruction Management and Economics, 2011
- Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projectsInternational Journal of Project Management, 2010
- Integrated Design and Engineering using Building Information Modelling: A Pilot Project of Small-Scale Housing Development in The NetherlandsArchitectural Engineering and Design Management, 2010
- A comprehensive model for planning and controlling contractor cash-flowInternational Journal of Project Management, 2009
- A cost control system development: A collaborative approach for small and medium-sized contractorsInternational Journal of Project Management, 2009
- A model for integrating cost management and production planning and control in constructionJournal of Financial Management of Property and Construction, 2006
- Constraints to the Use of Off-site Production on Construction ProjectsArchitectural Engineering and Design Management, 2005
- Prediction and optimization of life-cycle costs in early designBuilding Research & Information, 2000
- Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristicsEuropean Journal of Operational Research, 1993