Heuristics for minimizing tool switches when scheduling part types on a flexible machine
Authors:
- 1 August 1998
- journal article
- research article
- Published by Taylor & Francis in IIE Transactions
- Vol. 30 (8) , 689-694
Abstract
This article considers a tool loading problem whose objective is to minimize the number of tool switches over time in order to process several parts on a flexible machine. New heuristics are presented and compared. Some of these are shown to be superior to existing methods.Keywords
This publication has 9 references indexed in Scilit:
- Tool magazine arrangement and operations sequencing on CNC machinesComputers & Operations Research, 1996
- An improved tabu search approach for solving the job shop scheduling problem with tooling constraintsDiscrete Applied Mathematics, 1996
- Multiperiod tool and production assignment in flexible manufacturing systemsInternational Journal of Production Research, 1994
- Minimizing the number of tool switches on a flexible machineInternational Journal of Flexible Manufacturing Systems, 1994
- A Synthesis of Decision Models for Tool Management in Automated ManufacturingManagement Science, 1993
- New Insertion and Postoptimization Procedures for the Traveling Salesman ProblemOperations Research, 1992
- A flexible approach to part type selection in flexible flow systems using part mix ratiosInternational Journal of Production Research, 1991
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool SwitchesOperations Research, 1988
- A study of FMS part type selection approaches for short-term production planningInternational Journal of Flexible Manufacturing Systems, 1988