A Generic Model and Hybrid Algorithm for Hoist Scheduling Problems
Authors:
- 1 January 1998
- book chapter
- Published by Springer Nature in Lecture Notes in Computer Science
- p. 385-399
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Constraint Logic Programming: A Survey1998
- Constraint Logic Programming and Integer Programming approaches and their collaboration in solving an assignment scheduling problemConstraints, 1997
- The progressive party problem: Integer linear programming and constraint programming comparedConstraints, 1996
- DETERMINING OPTIMAL CYCLIC HOIST SCHEDULES IN A SINGLE-HOIST ELECTROPLATING LINEIIE Transactions, 1994
- Study of a NP-hard cyclic scheduling problem: The recurrent job-shopEuropean Journal of Operational Research, 1994
- Minimizing the fleet size with dependent time-window and single-track constraintsOperations Research Letters, 1993
- The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window ConstraintsManagement Science, 1991
- Solving large combinatorial problems in logic programmingThe Journal of Logic Programming, 1990
- Hoist Scheduling For A PCB Electroplating FacilityIIE Transactions, 1988
- Mathematical Programming Solution of a Hoist Scheduling ProgramA I I E Transactions, 1976