Generalized pairwise interchanges and machine scheduling
- 1 June 1995
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 83 (2) , 310-319
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- A note on “minimizing a quadratic function of job lateness on a single machine”International Journal of Production Economics, 1993
- A new lower bound approach for single-machine multicriteria schedulingOperations Research Letters, 1992
- Bicriterion jobshop scheduling with total flowtime and sum of squared latenessEngineering Costs and Production Economics, 1991
- Tabu search methods for a single machine scheduling problemJournal of Intelligent Manufacturing, 1991
- Parametric precedence relations in single machine schedulingOperations Research Letters, 1990
- Minimizing a generalized quadratic penalty function of job completion times: An improved branch-and-bound approachEngineering Costs and Production Economics, 1990
- Minimizing Weighted Absolute Deviation in Single Machine SchedulingIIE Transactions, 1987
- Minimizing a quadratic function of job lateness on a single machineEngineering Costs and Production Economics, 1983
- One-Machine Sequencing to Minimize Certain Functions of Job TardinessOperations Research, 1969
- Various optimizers for single‐stage productionNaval Research Logistics Quarterly, 1956