Conversion of non‐calendar to calendar‐time based preventive maintenance schedules for semiconductor manufacturing systems
Authors:
- 21 August 2007
- journal article
- Published by Emerald Publishing in Journal of Quality in Maintenance Engineering
- Vol. 13 (3) , 259-275
Abstract
Purpose – The aim of this paper is to present the rationale, a numerical example and a case study of the application of an algorithm to convert non-calendar based preventive maintenance (PM) schedules into calendar-time format for semiconductor manufacturing systems (SMS). The resulting calendar-time PM schedules can be utilized as a baseline within a PM scheduling optimization process. Design/methodology/approach – The algorithm utilizes estimations of work-in-process (WIP) and system parameters to estimate an equivalent calendar-time schedule for PM schedules based on different units. A numerical example based on fictitious data illustrates the utilization of the conversion algorithm within a mixed PM scheduling scenario, including wafer, processing-time and energy-based PM tasks for multi-chamber tools. In addition, a case study illustrates the accuracy of the algorithm by comparing estimated PM targets (i.e. due, warning and late dates) with historical data from a real semiconductor fabrication facility. Findings – Results from the case study validated the conversion algorithm by showing accurate estimations of PM targets (i.e. due, warning and late dates). The accuracy of the algorithm depends, however, on good estimates for WIP levels within the planning horizon. Originality/value – The conversion algorithm may be utilized not only in SMS but also in other industries that require the conversion of non-calendar based PM schedules into calendar-time format for PM optimization and operational purposes.Keywords
This publication has 9 references indexed in Scilit:
- Optimal Preventive Maintenance Scheduling in Semiconductor ManufacturingIEEE Transactions on Semiconductor Manufacturing, 2004
- An algorithm to convert wafer to calendar-based preventive maintenance schedules for semiconductor manufacturing systems2004
- Europe's semiconductor makers are back in the gameIEEE Spectrum, 2003
- Optimization of preventive maintenance scheduling for semiconductor manufacturing systems: models and implementation2002
- A total standard WIP estimation method for wafer fabricationEuropean Journal of Operational Research, 2001
- Towards a general condition based maintenance model for a stochastic dynamic systemJournal of the Operational Research Society, 2000
- A review of multi-component maintenance models with economic dependenceMathematical Methods of Operations Research, 1997
- A dynamic policy for grouping maintenance activitiesEuropean Journal of Operational Research, 1997
- Markov Decision Processes1994