An improved discrete backtracking searching algorithm for fuzzy multiproduct multistage scheduling problem
Authors:
- Xueli YanXYXueli Yan
- Yuxin HanYHYuxin Han
- Xingsheng GuXGXingsheng Gu
- 1 July 2020
- journal article
- research article
- Published by Elsevier in Neurocomputing
- Vol. 398, 153-165
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (61973120, 61573144, 61773165, 61673175)
- Fundamental Research Funds for the Central Universities (222201917006)
This publication has 30 references indexed in Scilit:
- An efficient job-shop scheduling algorithm based on particle swarm optimization☆Expert Systems with Applications, 2010
- A novel search framework for multi‐stage process scheduling with tight due datesAIChE Journal, 2009
- Scheduling Model for a Multi‐Product Batch Plant Using a Pre‐Ordering ApproachChemical Engineering & Technology, 2008
- Simultaneous Batching and Scheduling in Multistage Multiproduct ProcessesIndustrial & Engineering Chemistry Research, 2008
- Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storageChemical Engineering Science, 2007
- Genetic algorithm for large-size multi-stage batch plant schedulingChemical Engineering Science, 2007
- A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plantsChemical Engineering Science, 2005
- Scheduling Parallel Production Lines with Resource Constraints. 1. Model FormulationIndustrial & Engineering Chemistry Research, 2002
- A Continuous Time Mixed Integer Linear Programming Model for Short Term Scheduling of Multistage Batch PlantsIndustrial & Engineering Chemistry Research, 1995
- Some efficient heuristic methods for the flow shop sequencing problemEuropean Journal of Operational Research, 1990