Robust simulation-based scheduling methodology to reduce the impact of manual installation tasks on low-volume aerospace production flows

Authors:
  • DSDennis J.L. Siedlak
    Dennis J.L. Siedlak
  • OPOlivia J. Pinon
    Olivia J. Pinon
  • BRBradford E. Robertson
    Bradford E. Robertson
  • DMDimitri N. Mavris
    Dimitri N. Mavris

Abstract
No abstract available
Funding Information
  • Boeing Research & Technology in general
  • Center for Applied Simulation and Analytics (CASA)

This publication has 29 references indexed in Scilit: