Considering Project Management Activities for Engineering Design Groups
Open Access
- 27 October 2020
- journal article
- research article
- Published by Springer Nature in Operations Research Forum
- Vol. 1 (4) , 1-29
Abstract
No abstract availableKeywords
This publication has 110 references indexed in Scilit:
- An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problemComputers & Industrial Engineering, 2011
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithmsJournal of the Operational Research Society, 2003
- A self‐adapting genetic algorithm for project scheduling under resource constraintsNaval Research Logistics (NRL), 2002
- Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristicsInternational Journal of Production Research, 2001
- Performance and time to market: accelerating cycle time with overlapping stagesIEEE Transactions on Engineering Management, 2000
- Case-based reasoning and improved adaptive search for project schedulingNaval Research Logistics (NRL), 2000
- Efficient priority rules for the resource‐constrained project scheduling problemJournal of Operations Management, 1996
- Product Development in the World Auto IndustryBrookings Papers on Economic Activity, 1987
- Preselective strategies for the optimization of stochastic project networks under resource constraintsNetworks, 1983
- Resource-constrained Project Scheduling — The State of the ArtJournal of the Operational Research Society, 1972