CONSTRUCTABILITY IN INDUSTRIAL PLANTS CONSTRUCTION: A BIM-LEAN APPROACH USING THE DIGITAL OBEYA ROOM FRAMEWORK
Open Access
- 20 November 2017
- journal article
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 23 (8) , 1100-1108
Abstract
One of the main problems the construction industry faces is the high cost and slow execution time due to inadequate planning, which results in poor use of human resources. A common solution for reducing time and costs is the adoption of prefabricated components (prefabs). This paper proposes a novel methodology for interdisciplinary management of construction projects by integrating Building Information Modeling (BIM) and Lean Thinking to improve the production planning and control of pipe-rack modules in an industrial facility. The article first presents a literature review to assess the key synergies between BIM and Lean Thinking. These led to the development of a new integrated work methodology named Digital Obeya Room. This model focuses on the required workflows, the analysis of collected data, and the visual management of construction planning and control. A real-world empirical study in the Oil and Gas industry evaluated how the newly devised practices could improve prefabrication and preassembly planning. The proposed methodology was capable of reducing the welding-time in 8.7% related on global prefabrication average in construction projects from Fails Management Institute (FMI) prefabrication report survey 2017.Keywords
Funding Information
- Coordenação de Aperfeiçoamento de Pessoal de Nível Superior
This publication has 13 references indexed in Scilit:
- Constructability: Outline of Past, Present, and Future ResearchJournal of Construction Engineering and Management, 2017
- Avaliação da integração entre uma plataforma BIM e uma ferramenta de análise estruturalSistemas & Gestão, 2017
- 4D BIM for Environmental Planning and ManagementProcedia Engineering, 2017
- Modelling the costs of corporate implementation of building information modellingJournal of Financial Management of Property and Construction, 2011
- Technology adoption in the BIM implementation for lean architectural practiceAutomation in Construction, 2011
- Case studies in operations managementProduction Planning & Control, 2011
- Pros and cons of lean visual planning: experiences from four product development organisationsInternational Journal of Technology Intelligence and Planning, 2011
- Improving Value Generation in the Design Process of Industrial Projects Using CAVTJournal of Management in Engineering, 2006
- Benefits of Constructability on Construction ProjectsJournal of Construction Engineering and Management, 2001
- Constructability Concepts for Engineering and ProcurementJournal of Construction Engineering and Management, 1987