International procurement policies influencing renewable energy siting – implications for South Africa
Open Access
- 13 December 2021
- journal article
- research article
- Published by Academy of Science of South Africa in Journal of Energy in Southern Africa
- Vol. 32 (4) , 58-68
Abstract
The South African Renewable Independent Power Producer Procurement Programme selects bid winners based on bid tariff (70% weighting) and various economic development criteria (30% weighting). Locating renewable energy (RE) projects in areas with better resources increases their cost competitiveness. As a result, most successful bids for wind and solar photovoltaic (PV) systems to date have been concentrated in the Eastern Cape and Northern Cape provinces, respectively. Studies have shown that a wider geographic distribution of wind and solar PV projects mitigates the impacts of the variability of wind and solar PV resources, eases grid congestion and generally improves the power system’s operation. This paper conducts a literature review to investigate the procurement methods used in different regions of the world to influence the placement of RE plants, the results of which then inform proposals on adjustments to the current REI4P. The study finds that, after congestion incidents due to concentration of RE plants, some regions implement location-based tariff, where high-resource areas receive the lowest tariff and vice versa. Other regions prioritise on building transmission infrastructure in high-resource areas, while others limit the size of RE installations in one area. Given the current generation and transmission constraints in South Africa, it is important to encourage geographical dispersion of RE plants and avoid RE curtailment, since this can escalate the cost of RE integration significantly.Keywords
This publication has 15 references indexed in Scilit:
- The Spanish Turn against Renewable Energy DevelopmentSustainability, 2018
- The South African Renewable Energy Independent Power Producer Procurement Programme: A Review and Lessons LearnedJournal of Energy in Southern Africa, 2016
- Curtailment in a Highly Renewable Power System and Its Effect on Capacity FactorsEnergies, 2016
- Germany’s energy transition policy between national targets and decentralized responsibilitiesJournal of Integrative Environmental Sciences, 2015
- IEA Wind Task 26. Wind Technology, Cost, and Performance Trends in Denmark, Germany, Ireland, Norway, the European Union, and the United States: 2007–20122015
- Renewable energy production in Spain: A reviewRenewable and Sustainable Energy Reviews, 2014
- States of transmission: Moving towards large-scale wind powerEnergy Policy, 2013
- Review of recent offshore wind power developments in chinaWind Energy, 2012
- The role of power system flexibility in generation planning2011
- Renewable energy policy in Germany: pioneering and exemplary regulationsEnergy for Sustainable Development, 2004