A deterministic economic production quantity model with partial backordering and outsourcing repair of non-conforming products
Author:
- 27 March 2021
- journal article
- research article
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 9 (3) , 355-383
Abstract
In this paper, an economic production quantity model for an imperfect production system with reparation of non-conforming products is studied. The system allows shortages and a proportion of the shortages are backordered, following a last-in/first-out (LIFO) policy. It is assumed that the repair of non-conforming products cannot be carried out in the manufacturer's production system. Therefore, the company decides to have the repairs carried out in a repair centre. Depending on the time when the consignment of reworked items returns to the manufacturer's stocks, this study identifies three cases. The paper shows the derivation of the optimal solution for each case. The required conditions for the initial value of the backordering rate are developed in order to achieve optimal partial backordering. The model is also compared with a modified version that includes not only outsourcing repair of non-conforming products but also full backordering. The numerical examples comparing full backordering with partial backordering indicate that partial backordering is more profitable than full backordering when return of the repaired items to the system leaves a negative inventory level; that is, when there is a shortage.Keywords
This publication has 55 references indexed in Scilit:
- An economic order quantity model with a known price increase and partial backorderingEuropean Journal of Operational Research, 2013
- A note on the deterministic EPQ with partial backorderingOmega, 2009
- The deterministic EPQ with partial backordering: A new approach☆Omega, 2009
- An economic lot-size model with partial backlogging hinging on waiting time and shortage periodApplied Mathematical Modelling, 2007
- Lot sizing in a production system with rework and product deteriorationInternational Journal of Production Research, 2005
- Planning and control of rework in the process industries: A reviewProduction Planning & Control, 2002
- Production lot sizing with the reworking of imperfect quality items producedProduction Planning & Control, 2001
- Mixture Inventory Model with Backorders and Lost Sales for Variable Lead TimeJournal of the Operational Research Society, 1996
- Economic Production Cycles with Imperfect Production ProcessesIIE Transactions, 1986
- Inventory models with a mixture of backorders and lost salesNaval Research Logistics Quarterly, 1973