Damage to Treasury: Abnormally Low Tenders in Public Construction Works
Authors:
- 1 August 2009
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 1 (3) , 130-136
Abstract
The purpose of this paper is to determine the adverse effect of abnormally low tenders (ALTs) on public construction works in Turkey. A comprehensive literature review was performed to investigate the reasons of ALTs. This paper categorizes the reasons behind ALTs with the help of a questionnaire to which 430 construction companies responded. A detailed analysis of the submitted questionnaires revealed a number of reasons for ALTs and their adverse effect on the construction industry. Staying in the business, miscalculation of bid price, work experience document, and inaccuracy of the conceptual cost were found to be the main reasons behind ALTs. A better database system for contractors on market unit prices, a better quality control assessment in construction and postconstruction phases, full complete design documents in tender packages, and a better evaluation system on the assessment of ALTs are recommended by the study.Keywords
This publication has 5 references indexed in Scilit:
- Contractor’s Opportunistic Bidding Behavior and Equilibrium Price Level in the Construction MarketJournal of Construction Engineering and Management, 2007
- Public Procurement Law in TurkeyJournal of Professional Issues in Engineering Education and Practice, 2006
- Wild Bids. Gambling for Resurrection in Procurement ContractsJournal of Regulatory Economics, 2004
- Multiple criteria models for evaluation of competitive bidsIMA Journal of Management Mathematics, 2000
- Average‐Bid Method—Competitive Bidding StrategyJournal of Construction Engineering and Management, 1993