Scheduling setup changes at bottleneck facilities in semiconductor manufacturing
Authors:
- Z. DuwwayriZDZ. Duwwayri
- M. MollaghasemiMMM. Mollaghasemi
- 13 November 2002
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Abstract
No abstract availableThis publication has 4 references indexed in Scilit:
- A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilitiesJournal of Manufacturing Systems, 1998
- Minimum inventory variability schedule with applications in semiconductor fabricationIEEE Transactions on Semiconductor Manufacturing, 1996
- Practical issues in scheduling and dispatching in semiconductor wafer fabricationJournal of Manufacturing Systems, 1993
- Scheduling semiconductor wafer fabricationIEEE Transactions on Semiconductor Manufacturing, 1988