Optimizing Drawdown Strategies in Wells Producing from Complex Fracture Networks
Authors:
- 16 October 2018
- conference paper
- Published by Society of Petroleum Engineers (SPE)
Abstract
In unconventional reservoirs, the presence of natural fractures coupled with high pore pressures leads to the creation of complex fracture networks. During drawdown, the fracture network experiences large changes in the stresses which can affect the fracture conductivity, and hence the production rate. We present a workflow to find an optimum drawdown strategy in which the fractures can remain conductive while maintaining a high enough drawdown to maximize production. A fully coupled geomechanical reservoir simulator is developed to simulate production from complex fracture networks. Flow in the fracture and reservoir domains is solved in two separate conforming meshes which are coupled through matrix-fracture transfer indices. The complex fracture network is represented as an explicit discontinuity in the reservoir domain which is essential to capture the stress variations in the vicinity of the fractures due to reservoir depletion and fracture closure. The fracture closure process is modeled dynamically using the Barton-Bandis contact relationship, and the fracture conductivity is determined using the fracture width and proppant concentration. This model is used to study the impact of drawdown strategy on fracture conductivity and well productivity. It is observed that the estimated ultimate recovery (EUR) from complex fracture networks depends upon the connected fracture conductivity and the applied drawdown. A conservative drawdown strategy maintains the fracture conductivity for a longer period but results in a lower initial production rate. As the drawdown is increased, the unpropped fractures close and can cause a large portion of the fracture network (the part behind the closed segment) to get disconnected from the wellbore. This reduces the available fracture area for production. Although an aggressive drawdown strategy results in higher initial production rates, it can lead to faster fracture closure, in turn resulting in a lower EUR. Impact of drawdown strategy on productivity is analyzed at different fracture closure rates. We show that the optimum choke management strategy depends on the sensitivity of the fracture conductivity to stress. A coupled geomechanical reservoir model is presented that can simulate production with dynamic fracture closure in complex fracture networks to quantify this effect.Keywords
This publication has 24 references indexed in Scilit:
- Choke Management Strategies for Hydraulically Fractured Wells and Frac–Pack Completions in Vertical Wells2016
- The Role of Induced Un-propped (IU) Fractures in Unconventional Oil and Gas Wells2015
- A hierarchical fracture model for the iterative multiscale finite volume methodJournal of Computational Physics, 2011
- Control‐volume method for numerical simulation of two‐phase immiscible flow in two‐ and three‐dimensional discrete‐fractured mediaWater Resources Research, 2004
- An Efficient Discrete-Fracture Model Applicable for General-Purpose Reservoir SimulatorsSPE Journal, 2004
- Integrating Fracture Mapping Technologies to Optimize Stimulations in the Barnett Shale2002
- Experimental Study of Hydraulic Fracture Conductivity Demonstrates the Benefits of Using Proppants2000
- Engineering Criteria for Fracture Flowback Procedures1995
- Minimizing Damage to a Propped Fracture by Controlled Flowback ProceduresJournal of Petroleum Technology, 1988
- Fundamentals of rock joint deformationInternational Journal of Rock Mechanics and Mining Sciences, 1983