The supply of green electricity certificates (GECs) exceeds the demand, leading to companies being more willing to purchase GECs to meet their emission reduction obligations. However, concerns have been raised about the environmental impact of renewable energy (RE) projects labeled as “greenwashing”. Drawing on the “additionality” theory, we developed a cost model with construction, operation, and discount rates. We utilized cost data from China’s onshore wind and photovoltaic power generation in our study. After 10,000 Monte Carlo simulations, we made the following findings: (1) The environmental benefits of RE power generation diminish over time, and the time limit for judging whether RE projects have additional costs compared with traditional thermal power should be considered; (2) The time limit for marginal environmental effects of China’s onshore wind and photovoltaic power generation is estimated to be 7.65–10.78 years and 5.44–7.25 years, respectively. The analysis methods and ideas proposed in this paper can provide reference for the development of the GEC system in China and even other countries.Keywords
Funding Information
- National Natural Science Foundation of China (72174151, 21YJAZH113)
- Humanities and Social Science Fund of Ministry of Education of China (72174151, 21YJAZH113)
- Wuhan University (72174151, 21YJAZH113)
This publication has 33 references indexed in Scilit:
- Analysis of feed-in tariff policies for solar photovoltaic in China 2011–2016Applied Energy, 2017
- Sustainable photovoltaic technology development: step-by-step guidance for countries facing PV proliferation turmoil under the feed-in tariff schemeRenewable and Sustainable Energy Reviews, 2015
- Review on the costs and benefits of renewable energy power subsidy in ChinaRenewable and Sustainable Energy Reviews, 2014
- Additionality of wind energy investments in the U.S. voluntary green power marketRenewable Energy, 2014
- Probabilistic decision model of wind power investment and influence of green power marketEnergy Policy, 2013
- Standardization of baseline and additionality determination under the CDMClimate Policy, 2013
- The best time to invest in photovoltaic panels in FlandersRenewable Energy, 2013
- Monte-Carlo based uncertainty analysis: Sampling efficiency and sampling convergenceReliability Engineering & System Safety, 2013
- Assessing the additionality of CDM projects: practical experiences and lessons learnedClimate Policy, 2009
- Tradable green certificates in Flanders (Belgium)Energy Policy, 2004