Aligning workload control theory and practice: lot splitting and operation overlapping issues
- 5 November 2015
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 54 (10) , 2965-2975
Abstract
This paper addresses the problem of lot splitting in the context of workload control (WLC). Past studies on WLC assumed that jobs released to the shop floor proceed through the different stages of processing without being split. However, in practice, large jobs are often split into smaller transfer sublots so that they can move more quickly and independently through the production process and allow operations overlapping relating to the same job. This paper assesses the performance of different lot splitting policies for job release and dispatching strategies under lot splitting. A new dispatching rule was designed to specifically take advantage of lot splitting and operations overlapping in the context of WLC. Discrete-event simulation is used to assess system performance in relation to the ability to provide shorter delivery times and on time deliveries. Results highlight the importance of releasing the sublots of the same job together and demonstrate that combining an effective lot splitting policy with an appropriate dispatching rule can enhance the performance of production systems.Keywords
Funding Information
- FCT-Fundação para a Ciência e Tecnologia of Portugal (PEst2015-2020: UID/CEC/00319/2013)
This publication has 29 references indexed in Scilit:
- A review of production planning and control: the applicability of key concepts to the make-to-order industryInternational Journal of Production Research, 2005
- Lot sizing in workload control systemsProduction Planning & Control, 2002
- A batch splitting method for a job shop scheduling problem in an MRP environmentInternational Journal of Production Research, 1999
- Transfer batch scheduling for a two-stage flowshop with identical parallel machines at each stageOmega, 1997
- A hybrid two-stage flowshop with part family, batch production, major and minor set-upsEuropean Journal of Operational Research, 1997
- Order review/release and lot splitting in drum-buffer-ropeInternational Journal of Production Research, 1997
- An integrated system for controlling shop loading and work flowInternational Journal of Production Research, 1995
- Alternative order release mechanisms: a comparison by simulationInternational Journal of Production Research, 1994
- The impact of lot splitting on due date performanceJournal of Operations Management, 1994
- Load‐limited order release in job shop scheduling systemsJournal of Operations Management, 1988