Construction Control of Long-Span Combined Rail-Cum-Road Continuous Steel Truss Girder Bridge of High-Speed Railway
Open Access
- 20 November 2025
- Vol. 15 (22) , 4204
Abstract
The construction of long-span continuous steel truss rail-cum-road bridges for high-speed railways presents significant challenges, primarily due to structural complexity, stringent deformation tolerances, and intricate construction sequences. This paper presents a comprehensive construction control methodology developed and implemented for such bridges. Using a real-world bridge project in China as a case study, the methodology integrates mechanical analysis of key construction stages, deformation prediction, real-time monitoring, and adjustment techniques. Furthermore, the application of machine learning (ML) for camber prediction is explored. Key findings indicate that the longitudinal displacement (X-direction) of the top chord at the upper-deck closure segment is highly sensitive to temperature variations, with a differential of about 10–12 mm observed under a 15 °C temperature change. Consequently, closure welding is recommended near the design reference temperature, with field measurements guiding final fit-up adjustments. A comparative analysis between ML predictions and theoretical methods for member elongation revealed that the Extra Trees (ET) model and K-Nearest Neighbors (KNN) model achieved excellent accuracy, with errors within 2 mm, demonstrating the feasibility of ML-based camber setting. The proposed integrated approach, combining finite element analysis, real-time monitoring, and detailed sensitivity analysis of closure accuracy, proves effective in ensuring structural safety and meeting precise alignment requirements, particularly for high-speed railway track. The findings offer valuable insights for the construction control of similar long-span steel truss rail-cum-road bridges.Keywords
Funding Information
- National Natural Science Foundation of China (52068022)
- Fundamental Research Funds for the Central Universities (300102213517)
- Science and Technology Research Program of China State Railway Group Co., Ltd. (2023G040)
This publication has 36 references indexed in Scilit:
- Research on the physical characteristics of a novel modified foamed cement slurry with non-foamed PVA materialConstruction and Building Materials, 2025
- Behavior of incrementally launched modular steel truss bridgesEngineering Structures, 2024
- Multivariate temperature prediction model based on CNN-BiLSTM and RandomForestThe Journal of Supercomputing, 2024
- Fatigue damage assessment of a large rail-cum-road steel truss-arch bridge using structural health monitoring dynamic dataCase Studies in Construction Materials, 2024
- Learning from failure propagation in steel truss bridgesEngineering Failure Analysis, 2023
- Mechanical Properties and Experimental Study of a New Laminated Girder Single Tower Cable-Stayed BridgeInternational Journal of Steel Structures, 2023
- Process-independent construction stage analysis of self-anchored suspension bridgesAutomation in Construction, 2020
- Accelerated cable-stayed bridge construction using terrestrial laser scanningAutomation in Construction, 2020
- A comparative analysis of gradient boosting algorithmsArtificial Intelligence Review, 2020
- Analysis of height difference between three trusses of a steel truss bridge during incremental launchingStahlbau, 2018