Research on collaborative scheduling of multiple projects of prefabricated building based on the niche genetic-raccoon family optimization algorithm
Authors:
- Yinghui SongYSYinghui Song
- Junwu WangJWJunwu Wang
- Jiequn LuJLJiequn Lu
- Xiang SiXSXiang Si
Open Access
- 22 September 2022
- journal article
- research article
- Published by Elsevier in Alexandria Engineering Journal
- Vol. 64, 1015-1033
Abstract
No abstract availableKeywords
This publication has 41 references indexed in Scilit:
- Construction scheduling using Genetic Algorithm based on Building Information ModelExpert Systems with Applications, 2014
- Integrated Prefabrication Configuration and Component Grouping for Resource Optimization of Precast ProductionJournal of Construction Engineering and Management, 2014
- Learning process on priority rules to solve the RCMPSPJournal of Intelligent Manufacturing, 2013
- A genetic algorithm-based method for look-ahead scheduling in the finishing phase of construction projectsAdvanced Engineering Informatics, 2012
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relationsEuropean Journal of Operational Research, 2012
- Resource-constrained multi-project scheduling: Priority rule performance revisitedInternational Journal of Production Economics, 2010
- Proactive heuristic procedures for robust project scheduling: An experimental analysisEuropean Journal of Operational Research, 2008
- A bi-objective model for robust resource-constrained project schedulingInternational Journal of Production Economics, 2005
- Multiproject planning: tuning portfolio indicesInternational Journal of Project Management, 1994
- Breakthrough in multiproject management: how to escape the vicious circle of planning and controlInternational Journal of Project Management, 1993