Post-peak mechanical characteristics of the high-water material for backfilling the gob-side entry retaining: from experiment to field application
Authors:
- 20 May 2020
- journal article
- research article
- Published by Springer Nature in Arabian Journal of Geosciences
- Vol. 13 (11) , 1-13
Abstract
No abstract availableKeywords
Funding Information
- Fundamental Research Funds for the Central Universities (2017XKZD06)
This publication has 30 references indexed in Scilit:
- Design and construction of entry retaining wall along a gob side under hard roof stratumInternational Journal of Rock Mechanics and Mining Sciences, 2015
- Failure mechanism and control of deep gob-side entryArabian Journal of Geosciences, 2015
- Roof Deformation, Failure Characteristics, and Preventive Techniques of Gob-Side Entry Driving Heading Adjacent to the Advancing Working FaceRock Mechanics and Rock Engineering, 2015
- Spontaneous caving and gob-side entry retaining of thin seam with large inclined angleInternational Journal of Mining Science and Technology, 2014
- Numerical Modeling for Yield Pillar Design: A Case StudyRock Mechanics and Rock Engineering, 2014
- Backfilling technology in Kazakhstan minesJournal of Mining Science, 2013
- Stability and deformation of surrounding rock in pillarless gob-side entry retainingSafety Science, 2012
- Structural effect of a soft–hard backfill wall in a gob-side roadwayMining Science and Technology (China), 2011
- Experimental characterization of the influence of tailings fineness and density on the quality of cemented paste backfillMinerals Engineering, 2005
- An estimation method for cover pressure re-establishment distance and pressure distribution in the goaf of longwall coal minesInternational Journal of Rock Mechanics and Mining Sciences, 2004