Risk-based methodology to optimize geotechnical site investigations in tunnel projects
Authors:
- R. GangradeRGR. Gangrade
- J. GrasmickJGJ. Grasmick
- W. Trainor-GuittonWTW. Trainor-Guitton
- M. MooneyMMM. Mooney
- 20 June 2022
- journal article
- research article
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 127
Abstract
No abstract availableKeywords
This publication has 24 references indexed in Scilit:
- Optimization of site investigation program for improved statistical characterization of geotechnical property based on random field theoryBulletin of Engineering Geology and the Environment, 2016
- Abbauwerkzeugverschleiß und empirische Verschleißprognose beim Vortrieb mit Hydroschild‐TVM in Lockergesteinen2015
- Suggestion of an empirical prognosis model for cutting tool wear of Hydroshield TBMTunnelling and Underground Space Technology, 2015
- Optimization of site exploration program for improved prediction of tunneling-induced ground settlement in claysComputers and Geotechnics, 2014
- Choosing Between Two Kind of Sampling Patterns Using Geostatistical Simulation: Regularly Spaced or at High Uncertainty Locations?Natural Resources Research, 2011
- Expectation of boulder frequency when tunneling in glacial till: A statistical approach based on transition probabilityEngineering Geology, 2009
- Decision Analysis Applied to Tunnel Exploration Planning. II: Consideration of UncertaintyJournal of Construction Engineering and Management, 2007
- Decision Analysis Applied to Tunnel Exploration Planning. I: Principles and Case StudyJournal of Construction Engineering and Management, 2007
- Soil variability analysis for geotechnical practice2006
- A Mathematical Theory of CommunicationBell System Technical Journal, 1948