Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
Authors:
- Yuan-Shyi Peter ChiuYCYuan-Shyi Peter Chiu
- Kuang-Ku ChenKCKuang-Ku Chen
- Feng-Tsung ChengFCFeng-Tsung Cheng
- Mei-Fang WuMWMei-Fang Wu
- 1 January 2010
- journal article
- Published by Elsevier in Computers & Mathematics with Applications
- Vol. 59 (2) , 919-932
Abstract
No abstract availableKeywords
This publication has 29 references indexed in Scilit:
- An economic production lot size model with deteriorating items, stock-dependent demand, inflation, and partial backloggingApplied Mathematics and Computation, 2006
- A joint economic-lot-size model for purchaser and vendor in fuzzy senseComputers & Mathematics with Applications, 2005
- Heuristic genetic algorithms for general capacitated lot-sizing problemsComputers & Mathematics with Applications, 2002
- Lot size-reorder point inventory model with fuzzy demandsComputers & Mathematics with Applications, 2002
- Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutionsNaval Research Logistics (NRL), 1998
- Joint determination of preventive maintenance and safety stocks in an unreliable production environmentNaval Research Logistics (NRL), 1997
- Production-Inventory Systems with Unreliable MachinesOperations Research, 1994
- An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production ProcessesIIE Transactions, 1991
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production SystemManagement Science, 1987
- Economic Production Cycles with Imperfect Production ProcessesIIE Transactions, 1986