Duration Forecasting In Construction Projects: A Delphi-Based Approach
Author:
Open Access
- 1 August 2025
- journal article
- Published by Innovative Research Publication in International Journal of Innovative Research in Computer Science and Technology
- Vol. 13 (4) , 99-108
Abstract
The uncertainties (e.g. altering labor productivity, weather changes, material shipment delays, and site-based conditions) have been the root causes of the construction industry continuously struggling to perfectly estimate the durations of activities, which are expected to be properly planned, scheduled, and will thereby control the cost of a project. Conventional approaches that involve probabilistic assessments such as Critical Path Method (CPM) and Program Evaluation and review techniques (PERT) use fixed or constrained probabilistic estimations, and frequently do not consider the range of expert opinion or arrive at a consensus of uncertain time parameters. This paper will utilize a Delphi method that is a systematic, iterative process used to elicit and hone the views of the experts to come up with a collaborative approach to estimating the time taken by construction activities. The tasks are as follows: to carry out a Delphi survey of the experienced construction professionals in a series of rounds and reach the consensus on the likely ranges of project activity durations, and also test the technique by using a case study of a building construction project. Three surveys of anonymous panel of 12 experts (with more than 10 years of experience) were implemented, including the open-ended estimates, statistical feedback and revisions until the consensus was achieved (coefficient of variation was less than 15 per cent). The estimated duration based on the case study outcomes was refined down to 7 days to 13 days during foundation excavations (median: 10 days) and labor availability was used as the reason (35% weight). The Delphi method also proved more accurate since it yielded tighter ranges and smaller variance of schedules by 15 percent compared to PERT in the case study. Several factors combine in this research to give an easy-to-use and consensus-based method of duration estimation, and consequently improving risk management and schedule accuracy. It provides construction managers practical knowledge to make informed decisions regarding resource planning, facilitates the union with digital planning software, and encourages efficiency within an ecosystem where delays occur in more than 70 percent of projects creating resilient and sustainable project execution.Keywords
This publication has 19 references indexed in Scilit:
- Analysis the effect of cost parameters in construction projects using fuzzy delphi method and analytical hierarchy processAIP Conference Proceedings, 2024
- Forecasting project success in the construction industry using adaptive neuro-fuzzy inference systemInternational Journal of Construction Management, 2023
- Accurate estimation of cost and time utilizing risk analysis and simulation (case study: road construction projects in Iran)International Journal of Construction Management, 2023
- Risk resources management influence on public–private partnership risk management in construction industry. Confirmatory factor analysis approachJournal of Engineering, Design and Technology, 2022
- Preparing, conducting, and analyzing Delphi surveys: Cross-disciplinary practices, new directions, and advancementsMethodsX, 2021
- Project Management Practices in Private OrganizationsProject Management Journal, 2018
- The Delphi Method: Review and Use in Construction Management ResearchInternational Journal of Construction Education and Research, 2014
- Scenario construction via Delphi and cross-impact analysisTechnological Forecasting and Social Change, 2011
- Qualitative Research: Application of the Delphi Method to CEM ResearchJournal of Construction Engineering and Management, 2010
- Application of Delphi method in selection of procurement systems for construction projectsConstruction Management and Economics, 2001