A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors
Author:
- 1 July 1996
- journal article
- Published by Taylor & Francis in Production Planning & Control
- Vol. 7 (4) , 362-373
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Performance of priority rules in a due date flow shopOmega, 1992
- Schedules for a two-stage hybrid flowshop with parallel machines at the second stageInternational Journal of Production Research, 1991
- Branch and bound algorithm for the flow shop with multiple processorsEuropean Journal of Operational Research, 1991
- Mathematical Modeling of Scheduling ProblemsJournal of Information and Optimization Sciences, 1991
- Two new rules to minimize tardiness in a job shopInternational Journal of Production Research, 1990
- A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeingsInternational Journal of Production Research, 1990
- Scheduling algorithms for flexible flowshops: Worst and average case performanceEuropean Journal of Operational Research, 1989
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- A comparative analysis of the COVERT job sequencing rule using various shop performance measuresInternational Journal of Production Research, 1987
- A Solution to a Special Class of Flow Shop Scheduling Problems1973