Lot Sizing for Optimal Collection and Use of Remanufacturable Returns over a Finite Life‐Cycle
- 1 December 2006
- journal article
- Published by SAGE Publications in Production and Operations Management
- Vol. 15 (4) , 473-487
Abstract
Reverse supply chains process used product returns to recover value by re‐processing them via remanufacturing operations. When remanufacturing is feasible, the longer the return flows are delayed during the active (primary) market demand period of the product, the lower the value that can be recovered through these operations. In fact, in order to recover the highest value from remanufactured products, the collection rates, return timings, and reusability rates should be matched with the active market demand and supply. With these motivations, this paper is aimed at developing analytical models for the efficient use of returns in making production, inventory, and remanufacturing decisions during the active market. More specifically, we consider a stylistic setting where a collector collects used product returns and ships them to the manufacturer who, in turn, recovers value by remanufacturing and supplies products during the active market demand. Naturally, the manufacturer's production, inventory and remanufacturing decisions and costs are influenced by the timing and quantity of the collector's shipments of used product returns. Hence, we investigate the impact of the timing of returns on the profitability of the manufacturer‐collector pair by developing system‐wide cost optimization models. Analyzing the properties of the optimal shipment frequency, we observe that the fastest reverse supply chain may not always be the most efficient one.Keywords
This publication has 15 references indexed in Scilit:
- Contractual agreements for coordination and vendor‐managed delivery under explicit transportation considerationsNaval Research Logistics (NRL), 2006
- A model for reverse logistics entry by third-party providersOmega, 2002
- Production planning and control for remanufacturing: industry practice and research needsJournal of Operations Management, 2000
- The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problemInternational Journal of Production Research, 1999
- Production planning and control for remanufacturing: a state-of-the-art surveyRobotics and Computer-Integrated Manufacturing, 1999
- Product, process, and organizational design for remanufacture – an overview of researchRobotics and Computer-Integrated Manufacturing, 1999
- Optimal strategy for the integrated vendor-buyer inventory modelEuropean Journal of Operational Research, 1998
- Quantitative models for reverse logistics: A reviewEuropean Journal of Operational Research, 1997
- The single-vendor single-buyer integrated production-inventory model with a generalised policyEuropean Journal of Operational Research, 1997
- Strategic Issues in Product Recovery ManagementCalifornia Management Review, 1995