Benchmarking Natural Gas Pipeline Projects
- 11 June 2013
- conference paper
- Published by American Society of Civil Engineers (ASCE)
- p. 1532-1542
Abstract
The U.S. natural gas industry shows growth in revenues and an all-time high in net incomes. Project costs, however, are on the rise and cost overruns seem to be more common than in the past. Organizations are, consequently, interested in benchmarking, or comparing their organizations with industry leaders in order to potentially emulate best practices. Benchmarking, however, is often difficult because the required data is either proprietary or not available. The purpose of this study is to use a public data source to identify factors that affect project performance and, based on these performance indicators, propose a benchmarking model. The data for this study is gathered from submittals to the Federal Energy Regulatory Commission (FERC) for natural gas projects completed from 2005 to 2010. The method used for this study is a covariate analysis, and model validation includes residual diagnostics. Findings are that project type, pipeline length addition, compression/power addition, storage capacity addition, and construction duration are significant predictors of cost performance. The discussion includes a practical application of how organizations may use this model to measure performance and identify best practices. The conclusion includes recommendations on how this model may be expanded with ongoing research.Keywords
This publication has 11 references indexed in Scilit:
- A Cost Function for the Natural Gas Transmission Industry: Further ConsiderationsThe Engineering Economist, 2011
- Impact of crude oil market behaviour on unit bid prices: the evidence from the highway construction sectorConstruction Management and Economics, 2009
- Investigation of Bid Price Competition Measured through Prebid Project Estimates, Actual Bid Prices, and Number of BiddersJournal of Construction Engineering and Management, 2005
- Web-Based Benchmarking System for the Construction IndustryJournal of Construction Engineering and Management, 2005
- Neural Network Modeling of Highway Construction CostsJournal of Construction Engineering and Management, 2005
- Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate RegressionJournal of Construction Engineering and Management, 2003
- Predicting Accuracy of Early Cost Estimates Based on Estimate QualityJournal of Construction Engineering and Management, 2001
- Benchmarking – best practices: an integrated approachBenchmarking: An International Journal, 1999
- Benchmarking in Construction IndustryJournal of Management in Engineering, 1995
- Aiming high: Competitive benchmarking for superior performanceLong Range Planning, 1993