A Validation Methodology for a Combined Heating Cooling and Power (CHCP) Pilot Plant
Authors:
- 1 December 2004
- journal article
- Published by Wiley in Journal of Energy Resources Technology
- Vol. 126 (4) , 285-292
Abstract
A great number of variables significantly influence the energetic, environmental and economic results of CHP (Combined Heating and Power) and CHCP (Combined Heating Cooling and Power) plants operation, and as a consequence their project activity is rather complex. In order to select the best layout and properly size the machines, detailed data on hourly electric, thermal, and cooling demand are necessary, so that a series of plant life cycle simulations may have to be carried out. Unfortunately, such detailed data are rarely available, because energy consumptions data for existing buildings are usually derived from aggregated monthly or bimonthly gas and electricity bills. Even more difficulties are encountered for new types of buildings, for which no consumptions data are available. In such cases, the most common procedure consists in performing, using case-oriented criteria, an estimate of the thermal and cooling consumption levels, and to refine it during construction, if necessary. This is the case of an existing medium size CHCP pilot plant for office buildings that covers the electrical, thermal, and cooling loads of two office buildings situated in a Mediterranean area (Palermo, Sicily, Italy). Estimated demand profiles were used; the effect on thermal demand of the conversion of the cooling load into thermal one through an absorption chiller was assessed. This is a very significant aspect in all warm climates zones. Cumulative curves were obtained for the aggregate thermal demand, by summing the heat direct applications and the heat consumptions for feeding the absorption chiller. In this paper the existing plant was compared with other plant configurations, varying both for machine sizes and management criterion, in order to affirm whether or not the plant selected by the designer in a simplified manner was or not an appropriate solution. The comparison was performed from an energetic and economic viewpoint.Keywords
This publication has 9 references indexed in Scilit:
- Energy conservation in buildings: cogeneration and cogeneration coupled with thermal energy storageApplied Energy, 2004
- A measurement methodology for monitoring a CHCP pilot plant for an office buildingEnergy and Buildings, 2003
- A methodology for sizing a trigeneration plant in mediterranean areasApplied Thermal Engineering, 2003
- An analysis of electricity end-use in air-conditioned office buildings in Hong KongBuilding and Environment, 2003
- A methodology for building energy modelling and calibration in warm climatesBuilding and Environment, 2002
- Effective retrofitting scenarios for energy efficiency and comfort: results of the design and evaluation activities within the OFFICE projectBuilding and Environment, 2002
- Life-cycle operational and embodied energy for a generic single-storey office building in the UKEnergy, 2002
- Carbon-dioxide emissions from an integrated small-scale CHP and absorption chiller systemApplied Energy, 1998
- Energy efficiency of office equipment in commercial buildings: The case of ThailandEnergy, 1997