Adaptability Analysis of Integrated Project Delivery Method in Large- and Medium-Sized Engineering Projects: A FAHP-Based Modeling Solution
Open Access
Abstract
With the emerging large- and medium-sized engineering projects, prominent project delivery methods make sense in terms of cost, risk, management, and schedule. Among these, the Integrated Project Delivery (IPD) method stands out due to its adaptability for growing scale and complexity projects. This study compares the IPD method with other methods, emphasizing its benefits in large- and medium-sized projects and introducing the Fuzzy Analytic Hierarchy Process (FAHP) model to analyze IPD’s adaptability quantitatively. By conducting a matrix calculation of eighteen second-level indicators, this study derived weight values for four first-level indicators: Cost control, Risk control, Management control, and Schedule control. These first-level indicators were then used to formulate the total evaluation index calculation. Based on this foundation, we verified the calculations using a case study in Fujian. Implementing the IPD method led to a lower cost than the Owner’s Representative method and a one-year schedule acceleration. The FAHP model introduced in this study offers a novel and objective approach for adaptability analysis of the IPD method in large- and medium-sized engineering projects, coupling decision theory into project management.Keywords
Funding Information
- Shenzhen General Integrated Transportation and Municipal Engineering Design & Research Institute, Co., Ltd. (23HK0121)
This publication has 51 references indexed in Scilit:
- Evaluating the Engineering-Procurement-Construction Approach and Whole Process Engineering Consulting Mode in Construction ProjectsIranian Journal of Science and Technology, Transactions of Civil Engineering, 2023
- Research on each actor's awareness of procurement methods involving contractors and consultants in the design phase: Based on interviews with persons in chargeJAPAN ARCHITECTURAL REVIEW, 2023
- Multi-objective optimization for improved project management: Current status and future directionsAutomation in Construction, 2022
- A BIM-data mining integrated digital twin framework for advanced project managementAutomation in Construction, 2021
- Correction to: Some mathematical concepts of the analytic hierarchy processBehaviormetrika, 2021
- Role of the Owner’s Representative Within the Construction Industry: Case Study of ChileIranian Journal of Science and Technology, Transactions of Civil Engineering, 2019
- Safety Evaluation of Construction Based on the Improved AHP-Grey ModelWireless Personal Communications, 2018
- A process integrated engineering knowledge acquisition and management model for a project based manufacturingInternational Journal of Precision Engineering and Manufacturing, 2017
- Fuzzy Analytic Hierarchy Process and its Application2008
- The analytic hierarchy process—what it is and how it is usedMathematical Modelling, 1987