Optimal Repair and Inspection Rules under Uncertainty
- 1 June 2008
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Infrastructure Systems
- Vol. 14 (2) , 150-158
Abstract
This paper focuses upon the optimal repair and inspection policies of infrastructure under uncertainty in the facility deterioration process. It is supposed that the condition of the facility, which is defined in continuous state, can only be observed by inspection. The optimal impulse control problem is formulated to find out the optimal timing for inspection and repairing so as to minimize the expected life-cycle costs, including the repairing cost, user’s cost, and inspection cost. The state-dependent rules are presented to determine the optimal timing for inspection and repairing based upon the observation of condition state by solving the second-order Fredholm integral equation. The paper concludes with numerical examples, for illustration.Keywords
This publication has 10 references indexed in Scilit:
- An analytical solution for the finite-horizon pavement resurfacing planning problemTransportation Research Part B: Methodological, 2006
- The optimal repairing rules under demand risk2002
- A steady-state solution for the optimal pavement resurfacing problemTransportation Research Part A: Policy and Practice, 2002
- THE OPTIMAL REPAIRING RULES FOR PAVEMENTS UNDER UNCERTAINTYINFRASTRUCTURE PLANNING REVIEW, 2001
- Elementary Stochastic Calculus, with Finance in View1998
- Stochastic Differential Equations1998
- Optimal Inspection and Repair Policies for Infrastructure FacilitiesTransportation Science, 1994
- Incorporating inspection decisions in pavement managementTransportation Research Part B: Methodological, 1993
- Optimal Maintenance Decisions for Pavement ManagementJournal of Transportation Engineering, 1987
- A Statewide Pavement Management SystemInterfaces, 1982