Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil
- 28 April 2023
- journal article
- research article
- Published by Springer Nature in Operations Management Research
- Vol. 16 (3) , 1577-1593
Abstract
Equipment failure and production shortfalls can cause significant impacts on companies. Preventive maintenance can potentially increase equipment reliability and availability, helping companies achieve their corporate goals while reducing operation and maintenance costs. However, determining the optimal interval between maintenance interventions involves balancing various factors such as maintenance costs, equipment availability, risk of failures, and the need for corrective maintenance, as well as potential operational and financial impacts. Under this context, this paper aims to define the interval between preventive maintenance interventions for a key production equipment in a steel company located in Southeast region of Brazil. Upon documental analysis and interviews with experts, an AHP was applied to hierarchize the maintenance periodicity, based on the following criteria: part replacement based on service life, downtime hours for preventive maintenance, equipment reliability, and cost of materials and labour. A biweekly preventive maintenance periodicity was identified as the most adequate for the analysed device. An implementation plan was approved and preliminary results indicate no availability deterioration, while maintenance costs are below historical average.Keywords
This publication has 69 references indexed in Scilit:
- Tempo ótimo entre manutenções preventivas para sistemas sujeitos a mais de um tipo de evento aleatórioGestão & Produção, 2007
- The role of maintenance in improving companies’ productivity and profitabilityInternational Journal of Production Economics, 2007
- A combined goal programming—AHP approach to maintenance selection problemReliability Engineering & System Safety, 2006
- Modelo multicritério de apoio a decisão para o planejamento de manutenção preventiva utilizando PROMETHEE II em situações de incertezaPesquisa Operacional, 2005
- A condition-based failure-prediction and processing-scheme for preventive maintenanceIEEE Transactions on Reliability, 2003
- Selecting the most efficient maintenance approach using fuzzy multiple criteria decision makingInternational Journal of Production Economics, 2003
- Aggregating individual judgments and priorities with the analytic hierarchy processEuropean Journal of Operational Research, 1998
- Group preference aggregation methods employed in AHP: An evaluation and an intrinsic process for deriving members' weightagesEuropean Journal of Operational Research, 1994
- How to make a decision: The analytic hierarchy processEuropean Journal of Operational Research, 1990
- A scaling method for priorities in hierarchical structuresJournal of Mathematical Psychology, 1977